News
Diri Expresses Satisfaction Over Progress of Nembe-Brass Road Project
By Favour Bibaikefie
Governor of Bayelsa State, Senator Douye Diri, has expressed delight over the progress recorded on the ongoing construction of the first phase of the Nembe-Brass Road, describing the project as a major milestone in efforts to open up riverine communities in the state’s eastern senatorial district.
The governor made the remarks during an inspection tour of the 21-kilometre phase one section of the road project on Tuesday, where he assessed the level of work completed by the contractors.
The road project, which traverses challenging mangrove swamps and waterways, is considered one of the state’s most ambitious infrastructure undertakings aimed at linking previously inaccessible communities by road.
Accompanied by the Commissioner for Works and Infrastructure, ESV Moses Teibowei, Governor Diri inspected the completed asphalted stretch covering about 10 kilometres and several bridges before crossing by barge to evaluate ongoing work on another section that has already been stabilised.
Speaking after the inspection, Diri described the project as a fulfillment of a long-held aspiration of the people of Nembe and Brass local government areas.
“I feel accomplished. It is one thing to have the vision and another thing to have the will to do it,” the governor stated.
According to him, the road remains one of the most significant development projects undertaken in the state due to its strategic importance to the riverine communities.
“Being a Bayelsan, the importance of this road cannot be over-emphasised. This is what the people have been yearning for and I’m satisfied that the people are happy about the project,” he said.
The governor noted that his administration has consistently met its financial obligations to the contractors and expressed confidence that the project would be delivered as scheduled.
“On funding, we have never disappointed the contractor and I believe they will not disappoint us. By the time the road is completed, it will reduce cases of sea piracy,” Diri added.
He also acknowledged the support of President Bola Ahmed Tinubu for approving the second phase of the project being handled by the Federal Government.
“There was another President when we proposed this road. We wrote, nobody answered us then. But this President did not only answer us, he awarded the contract for the second phase,” he said.
Also speaking, the Commissioner for Works and Infrastructure, ESV Moses Teibowei, expressed satisfaction with the pace of work, noting that the most difficult aspects of the project had already been addressed.
He disclosed that the fifth bridge currently under construction is expected to be completed within the next three months and assured residents that the entire project remains on schedule.
Providing further updates on the project, the South-South Area Manager of Setraco Construction Company, covering Bayelsa and Rivers states, Mr. Jose Cosme, assured that the first phase of the Nembe-Brass Road would be completed and delivered by December 2026.
The Nembe-Brass Road project is widely regarded as a transformative infrastructure development expected to enhance transportation, improve economic activities, boost security, and strengthen connectivity between communities across Bayelsa’s riverine axis.
News
Warri Group Withdraws Support for Ereyitomi, Backs Mulade for 2027 Reps Election
By staff Reporter Rukevwe Odeh
A group of stakeholders in Warri has announced its decision to withdraw support for the incumbent member representing the Warri Federal Constituency in the House of Representatives, Hon. Thomas Ereyitomi, ahead of the 2027 general elections.
The group, while explaining its position, cited what it described as dissatisfaction with the lawmaker’s performance and representation of the constituency.
The stakeholders subsequently declared their support for Comrade Jude Ukori Mulade as their preferred candidate for the 2027 House of Representatives election.
According to the group, its decision followed concerns over the level of representation and development delivered to the constituency under the current administration.
The stakeholders said they were seeking a representative who would be more responsive to the needs of the people and more committed to advancing issues affecting residents across the constituency.
They urged other political stakeholders and eligible voters in Warri to consider Mulade’s candidacy as the 2027 elections approach.
The group’s endorsement adds to the growing political activities and realignments expected to shape the contest for the Warri Federal Constituency seat ahead of the 2027 general elections.
Ereyitomi, who currently represents the constituency in the House of Representatives, has yet to publicly respond to the allegations contained in the group’s statement.
News
DELTA: Persistent Flooding Raises Concerns Over Warri Airport Road
By staff Reporter Rukevwe Odeh
Residents and road users along the Warri Airport Road, particularly the section near Federal Government College in Warri South Local Government Area of Delta State, have continued to contend with recurring flooding despite years of road construction and rehabilitation efforts.
The affected stretch is frequently submerged following heavy rainfall, with inadequate drainage identified as a major factor contributing to the persistent flooding.
The recurring situation has raised concerns among motorists, residents and other road users, who say the condition of the road continues to disrupt movement and create difficulties for commuters whenever there is significant rainfall.
The development has also renewed calls for attention to the drainage system along the route, with residents hoping that a lasting solution will be implemented to prevent the road from repeatedly becoming flooded.
News
Heavy Rainfall Floods Ekpan Link Road in Delta
By staff Reporter: Rukevwe Odeh
A heavy downpour has left the popular NNPC Housing Complex Road, also known as Ekpan Link Road, submerged in floodwater in Uvwie Local Government Area of Delta State.
The rainfall caused significant water accumulation along the busy road, affecting movement and creating difficulties for motorists and other road users.
The condition of the road has renewed concerns over flooding and drainage challenges in the area, particularly during periods of heavy rainfall.
Residents and commuters are expected to exercise caution while using the affected route as efforts to manage the situation continue.
-
Social2 months agoNAIS – Northern Nigeria/Abuja Chapter Honours Amb. Ebi Lagos with Award of Recognition
-
Breaking3 months ago2027: INEC Alegedly Announces Plans to Conduct Party Primaries in the Newly Created State Constituencies in Warri North and Warri Southwest LGAs, Others
-
News1 month agoPAP: EX-AGITATORS OF BOYLOAF CAMP DISTANCE SELVES FROM THEIR LEADERS ONSLAUGHT ON THE PAP ADMINISTRATOR
-
Local News4 months agoJust In: Ambassador Podoki Emerges APP Candidate for Burutu Constituency-I Assembly Seat
-
Politics3 months ago2027: Mulade Challenges NDC’s Substitution of His Party Candidacy, Demands ₦5 Billion Damages
-
Breaking3 months agoTinubu Intervenes in Warri Delineation Dispute, Meets Ijaw, Urhobo and Itsekiri Leaders
-
Local News4 months agoINC: Group Faults Sponsored Attacks on Tompolo, Igbadiwei, Urges Unity in Ijaw Nation
-
Entertainment2 months agoJKing Logistics Coordinator Shed Light to Address Ijaw Music Wage Controversy
